A work order (also called a production order, or perintah kerja) is the instruction to make a quantity of one item by a date. In a spreadsheet factory, production is tracked on a whiteboard and material is taken from the store "as needed". At month end nobody can say how much steel went into last week's cabinets, and the stock count is always short.
The work order fixes that by making production a document with a life cycle. Material leaves the store against a work order, output enters stock from a work order, and the cost of both is collected on it. When it closes, you know what that batch really cost.
The life cycle
| Status | What it means | What happens in the system |
|---|---|---|
| Draft | Planned, not yet committed | Nothing reserved; quantity and date can change |
| Released | Approved for the floor | BOM version pinned, routing copied, components reserved |
| In progress | Work has started | Material issued, output reported, operations completed |
| Done | Finished | Remaining output received, leftover reservations freed, cost closed |
| Cancelled | Abandoned | Reservations freed; any value still in WIP written off |
Release: the commitment point
Release is where planning becomes a promise to the floor. Good practice is to release only what can actually be built:
- Material availability check. On release, the system computes the components needed (BOM quantity × order quantity, scrap included) and checks that free stock covers them. If not, release is refused, unless the planner deliberately releases short, knowing a purchase arrives before the material is needed.
- Reservations. The components are reserved for this order. Reserved stock is still on hand, but it is no longer available to promise to another order. Available = on hand − open reservations.
- Pinning. The BOM version and the routing are fixed on the order, so a design change tomorrow does not alter what this batch consumes.
Issuing material: pick or backflush
There are two ways to record what production consumed, and most plants use both:
- Manual issue (pick list). The store picks the components and posts the issue against the work order. Best for expensive, lot-tracked or variable-usage material, because the actual quantity is recorded.
- Backflush. The system issues components automatically when output is reported: 24 screws per cabinet reported, 24 screws issued. Best for cheap, high-volume items where counting each pick is not worth the effort (screws, labels, packaging).
Material that comes back unused is returned to stock against the same order, so the order is not charged for it.
Reporting output
Long orders should not wait until the end to put finished goods into stock. Report completed quantity as it is made:
- each report receives that quantity of the finished item into stock (with its lot or serial numbers if the item is tracked);
- backflushed components are issued in proportion to the quantity reported;
- labour and overhead for the share of the routing are absorbed into the order's cost.
When the last units are reported, the order is marked done. If the batch came in short, close it with what was made; the system will not let you report more than the order quantity. Over-production needs a new order, which keeps planned and actual quantities honest.
If a quality plan applies at production, reported output goes to a hold warehouse until it is inspected, exactly as at goods receipt. See Lots, serials and quality inspection.
What it does to the ledger
Production runs through a work in progress (WIP) account, an asset that holds value while it is neither raw material nor finished goods:
| Event | Debit | Credit |
|---|---|---|
| Issue 75 kg steel at Rp 18,000 | WIP 1,350,000 | Inventory 1,350,000 |
| Operation completed (labour) | WIP 130,000 | Applied labour 130,000 |
| Operation completed (overhead) | WIP 195,000 | Applied overhead 195,000 |
| Output 50 cabinets at item cost | Inventory | WIP |
| Close: remaining WIP balance | Production variance | WIP |
At close, whatever is left in WIP (actual cost minus the value of what was produced) goes to production variance, so a closed order leaves nothing behind in WIP. Why that variance exists and how to read it is in Product costing, WIP and variances.
Good habits on the floor
- Post at the time of the event. An issue typed in on Friday from paper notes makes stock wrong all week.
- Close orders promptly. An order finished but left open keeps value in WIP and reservations on stock.
- Return, don't hoard. Material left at the line after an order finishes goes back to the store against that order.
- Read the variance. A close with a large variance is a question, not a number to file: wrong BOM, wrong routing time, or waste on the floor?
In Voltrus
Known limits today: there is no field for finished units scrapped during production (record them with a scrap movement and a reason code), and no capacity check on release, so the planner must make sure the work centres can take the load.
Checklist
- Release only orders whose material is available or confirmed on the way.
- Decide per component: picked or backflushed, and write it on the BOM.
- Report output as it is made, not at the end of the month.
- Close orders within a day of the last output, and review every variance above your threshold.